Biogas Piping and Distribution Kit
Build a safe, organised and reliable gas network connecting your biodigester, purification unit, storage balloon, pressure regulator and appliances.
Connect Every Part of Your Biogas System
A biogas system is only as dependable as the network carrying gas from production to use. Poor pipe sizing, unsuitable fittings, excessive bends, condensate accumulation and weak joints can cause pressure loss, leakage and unreliable appliance performance.
Dominion Biogas Services supplies and installs piping kits designed around gas flow, distribution distance, pressure, number of outlets, site layout and end-use demand.
Reliable Gas Delivery with Reduced Pressure Loss
Correct pipe sizing supports reliable delivery.
Gas-compatible fittings improve system integrity.
Pipe slopes and water traps reduce blockage.
Manifolds and branches serve several users.
Valves allow safer maintenance.
Modular layouts accommodate future growth.
From Household Connections to Complete Networks
PACKAGE 1
Residential Distribution Kit
For one or two household appliances.
PACKAGE 2
Commercial Distribution Package
For restaurants, hotels and small institutions.
PACKAGE 3
Institutional Distribution Network
For campuses, hospitals and larger facilities.
What the Package Can Include
Designed According to Flow, Distance and Demand
| Pipe Material | HDPE or approved gas-compatible material |
| Pipe Diameter | Selected from flow, distance and allowable pressure loss |
| Operating Pressure | Low-pressure biogas service |
| Installation Route | Above ground, underground or mixed |
| Condensate Control | Pipe slopes, traps and drainage points |
| Isolation | Main, branch and appliance shut-off valves |
| Testing | Pressure and leak testing before commissioning |
From Route Planning to Final Leak Testing
1. Site Survey
Review the gas source, route and appliance locations.
2. Hydraulic Design
Calculate pipe sizes and pressure losses.
3. Route Preparation
Prepare trenches, supports and protection.
4. Pipe Installation
Install mains, branches, valves and traps.
5. Testing
Pressure-test and inspect the network.
6. Commissioning
Verify gas flow and appliance operation.
Build a Complete Biogas Distribution System
Important Safety Notice
Biogas is flammable and may contain toxic hydrogen sulphide. Pipework, fittings and valves must be compatible with biogas, protected from damage and installed away from ignition sources. All joints must be leak-tested before commissioning.
Questions Clients Frequently Ask
What pipe is suitable for biogas?
HDPE and other approved gas-compatible materials are commonly used.
How is pipe diameter selected?
It is calculated from gas flow, length, fittings, elevation and allowable pressure loss.
Can pipes be installed underground?
Yes, with suitable trench preparation, protection and identification.
Why is a condensate trap needed?
It removes condensed water that could obstruct gas flow.
Can one network supply several buildings?
Yes, when flow, pressure loss, zoning and safety isolation are properly engineered.
Why is there no fixed price?
Price depends on diameter, length, fittings, valves, trenching, supports and installation conditions.
Connect Your Biogas System with Professionally Engineered Piping
Dominion Biogas Services provides route planning, pipe sizing, installation, valve integration, pressure testing and commissioning.
Demander un devis
Talk to an Engineer
Biogas Engineering • Piping • Purification • Storage • Pressure Regulation